Sewer System Operational in Jefferson Parish

07 September 2008

Jefferson Parish Westbank sewer system treatment plants and lift stations are now operational on commercial power or a combination of generator power and portable or vacuum pumps, so residents on the Westbank are no longer asked to limit to the amount of water going down their drains.

 

The Eastbank sewer system was restored to full operations on Friday on commercial power or a combination of generator power and portable or vacuum pumps, so the sewer system in Jefferson Parish is now completely operational with the exception of community of Barataria. Only Barataria residents are asked to limit the amount of wastewater going down their drains from sinks, bathtubs, washing machines and toilets. Residents in the rest of the parish can resume full use of their facilities.

As Entergy restores power throughout Jefferson Parish, more sewerage lift stations are being energized by commercial power. Commercial power allows the sewerage lift stations to operate at full capacity which gives the residents normal sewer service and reduces the threat of back flows into homes and businesses.

All Jefferson Parish citizens are asked to report any sewer back-up to the Department of Citizens Affairs at 736-6100.

 

website by plaine studios